At a product-level, the schedule is the primary tool to accelerate development by flagging landmines in the critical path. Once these are found, teams deploy resources, rescope the problem, or – very often – accept to slip the schedule.
This wrong "green lights schedule" structure, plus constant mitigation, at scale, is the fastest and most anti-fragile way to deliver a complex integrated system.
Traditional engineers get personal satisfaction from delivering uncontextualized scope before an arbitrary deadline. As a result, unchallenged and pocket-margined "realistic schedules" have become industry-norm. Unfortunately, when these individually-optimized schedules are stacked 1) product development is net slower because of insufficient parallel-pathing and 2) interdisciplinary failures are expensive, if not fully unresolvable, because of staggered deliveries without early integrated milestones.
On the contrary, if you start with a top-down product-driven schedule, and back out the individual contributors' timelines – while it forces unorthodox order of operations – you deliver a working system faster. And when early integration milestones inevitably have failures, the early, low-inertia system can respond quickly (opposed to billion-dollar rollbacks and redesigns – think F35, 787, JWST).
Of course, a "wrong but useful" schedule is a great way to piss off your team, so, there are prerequisites:
- System owners are contextualized on technical, finance, and business requirements; they hold all subsystem owners accountable; and they have the authority to make strategy, scope, and schedule trades
- Managers have relationships to determine and assign the right (sometimes non-obvious) person to a problem to pull in overall schedule (by putting muscle behind critical path items)
- Organization incentivizes (rather than retaliates against) risk-taking, failures, and escalations. Without trust and a fair heuristic to make decisions/trades, this system breaks
- Overhead to schedule/pivot is lightweight – granularity is only required when it matters (e.g. a 20-day "design the PCB" generic block is fine if it passes a vibe-check and is not critical path)
When done right, small teams can deliver insane scope in impressive timelines – and by design, alongside a totally wrong schedule.